Ahmadbayli–Fuzuli–Shusha Highway

Construction of the km 34+000 – km 51+000 section — successfully delivered in just 6 months.

Period
2022 (6 months)
Location
Fuzuli – Shusha

Key figures

17 km

road section

6

months to delivery

Ahmadbayli–Fuzuli–Shusha Highway

The construction of the km 34+000 – km 51+000 section of the Ahmadbayli–Fuzuli–Shusha highway, which began in January 2022, was successfully delivered just 6 months later.

This project showcases our standards of speed and quality: roadbed construction, excavation and filling works on a 17-kilometre section in mountainous terrain were completed in a short time and in full compliance with the technology.

Part of the Victory Road, this route is a section of the strategically important transport corridor leading to the city of Shusha.