Ongoing Gadabay Gold Mine
Excavation and hauling of gold- and copper-bearing ore since 2018 — 370,000 tonnes per month, 4.44 million tonnes per year.
370,000 tonnes of ore hauled per month
The key projects we have delivered and those currently in progress.
Ongoing Excavation and hauling of gold- and copper-bearing ore since 2018 — 370,000 tonnes per month, 4.44 million tonnes per year.
370,000 tonnes of ore hauled per month
Ongoing Construction of the roadbed and engineering structures on the km 19+040 – km 23+320 section of the new highway.
3,000,000 m³ of excavation
Ongoing Roadbed construction on the km 35+000 – km 72+800 section of the Kalbajar–Lachin highway.
37.8 km road section
Delivered Roadbed (earthbed) construction on the km 1+620 – km 3+920 section of the airport — a delivered project.
9,982,175 m³ excavated and hauled
Delivered Construction of the km 34+000 – km 51+000 section — successfully delivered in just 6 months.
17 km road section