Aghdara Damirli Copper–Molybdenum Mine

Excavation, loading and hauling as main contractor to the parent company since 2025 — 98 million tonnes planned, 24 million tonnes hauled to date.

Period
2025 – present
Partner
Azerbaijan International Mining Company Ltd
Location
Aghdara district

Key figures

98,000,000

tonnes — project scope

24,000,000

tonnes hauled to date

700 +

employees on the project

Aghdara Damirli Copper–Molybdenum Mine

Since 2025, A-A MMC has been carrying out excavation, loading and hauling works as main contractor to the parent company on the Damirli Copper–Molybdenum Mine project of Azerbaijan International Mining Company Limited, located in the Aghdara district.

The project provides for hauling a total of 98 million tonnes of ore and waste rock. To date, our company has successfully completed 24 million tonnes of hauling.

We currently operate on the project around the clock, with more than 700 employees and an extensive machinery fleet, ensuring safe, responsive and efficient mining operations.

This is the largest project by volume that A-A MMC has undertaken to date, and the second major strand of our partnership with Azerbaijan International Mining Company Limited, which began at the Gadabay gold mine.