Aghdara Damirli Copper–Molybdenum Mine
Excavation, loading and hauling as main contractor to the parent company since 2025 — 98 million tonnes planned, 24 million tonnes hauled to date.
Key figures
98,000,000
tonnes — project scope
24,000,000
tonnes hauled to date
700 +
employees on the project
Since 2025, A-A MMC has been carrying out excavation, loading and hauling works as main contractor to the parent company on the Damirli Copper–Molybdenum Mine project of Azerbaijan International Mining Company Limited, located in the Aghdara district.
The project provides for hauling a total of 98 million tonnes of ore and waste rock. To date, our company has successfully completed 24 million tonnes of hauling.
We currently operate on the project around the clock, with more than 700 employees and an extensive machinery fleet, ensuring safe, responsive and efficient mining operations.
This is the largest project by volume that A-A MMC has undertaken to date, and the second major strand of our partnership with Azerbaijan International Mining Company Limited, which began at the Gadabay gold mine.